docs(release): reconcile status, compatibility and release evidence

- adopt docs/STABLE_RELEASE_IMPLEMENTATION.md as the single next-phase plan
- archive the stale M0.5 status snapshot under docs/history/
- record real local gate results, the red baseline CI, the Windows autocrlf
  reproduction and the unresolved macOS/native-CI status
- add COMPATIBILITY.md (protocol versions + honest platform matrix),
  CHANGELOG.md, dual license files, docs/releasing.md and docs/security-gate.md
- keep strict fail-closed: document the container EPERM/read-only cgroup probe
  and the exact G-C requirements instead of claiming isolation
- document foreign environment binding (ADR-0020) and add a release-candidate
  CI job that is gated on all platform jobs
This commit is contained in:
cflmy committed 2026-11-20 13:58:40 +08:00
1 parent faa6c95cfe
commit 18d9f39562
14 files changed
+2358 -482

No files matched your search

+14 -1
View File
@@ -2,7 +2,20 @@
**Start here:** read `docs/DEVELOPMENT_BLUEPRINT.md` before proposing code. It is the project architecture baseline. Then read `docs/STATUS.md` (what is actually implemented), the relevant `spec/` files, `docs/adr/` for frozen decisions, `docs/contributor-guide.md` for the workflow, and `tests/README.md` plus the conformance fixtures. Do not assume any current implementation or legacy Marqdo syntax is authoritative.
For next-phase work, also read `docs/CORE_STABILIZATION_AND_ECOSYSTEM_GATE.md` (current stabilization spec, baseline `0adebe4`, defining gaps B-01–B-18 and the G-A/G-B/G-C gates), `docs/NEXT_PHASE_IMPLEMENTATION.md` (M0.6 plan) and `docs/EXTENSIBILITY_AUDIT.md` (source-backed issues E01–E16). All are **Proposed** design input: the newer stabilization spec supersedes the earlier plans on the current baseline, gap list and release gates, while the M0.6 plan supersedes the blueprint on command-surface scope, extension registration, plugin addressing, package identity, repository decoupling and release gates. None describes implemented behavior, and each must be re-checked against current HEAD. `spec/tool-v1.md` is likewise a candidate protocol until an Accepted ADR and tests land.
For next-phase work, the single authoritative plan is
`docs/STABLE_RELEASE_IMPLEMENTATION.md` (stable-release gates G-A/G-B/G-C,
PR order and release checklist). Also read `docs/CORE_STABILIZATION_AND_ECOSYSTEM_GATE.md`
(historical stabilization spec, baseline `0adebe4`), `docs/NEXT_PHASE_IMPLEMENTATION.md`
(M0.6 plan), `docs/EXTENSIBILITY_AUDIT.md` (E01–E16), `COMPATIBILITY.md` and
`docs/security-gate.md`. The older plans are historical input: the stable-release
spec supersedes them on current baseline, gap list, PR order and release gates.
None describes implemented behavior; re-check against HEAD and tests. `strict`
remains fail-closed until G-C passes.
The stable-release spec also governs scope: do not add a top-level CLI command,
Knowledge/Proof/View special-casing, a second interpreter or a new package
registry. Fix the current Windows/macOS CI behavior, protocol/environment
correctness and release evidence before expanding the surface.
## Non-negotiable architectural constraints