Prepare RC.6 with an approved strict-unavailable gate
ci/woodpecker/pr/main Pipeline was successful
ci/woodpecker/push/main Pipeline was canceled
ci/woodpecker/manual/performance Pipeline failed

This commit is contained in:
cflmy committed 2026-11-27 23:22:56 +08:00
1 parent ed86796d6b
commit 6cfdd811b4
11 files changed
+112 -49

No files matched your search

+8
View File
@@ -15,6 +15,14 @@ separately and do not follow the product version. Dates use ISO 8601.
Older sections are release records: a retired option or spec they name is
available at its tagged commit, not in the current tree.
## 3.0.0-rc.6 (candidate)
- The release index binds the packaged CLI and Worker assets to the tested
source SHA and the actual stdlib Bundle inputs.
- A Linux RC can report strict isolation as unsupported with maintainer
approval and same-archive fail-closed evidence. Stable and LTS require a
passing disposable-VM gate.
## 3.0.0-rc.5 (2026-11-27)
Release record for tag `v3.0.0-rc.5` (Linux x86_64, glibc 2.39 prerelease).