diff --git a/AGENTS.md b/AGENTS.md index 009aa3a..52d1778 100644 --- a/AGENTS.md +++ b/AGENTS.md @@ -34,6 +34,16 @@ correctness and release evidence before expanding the surface. 10. Language semantics, package format, ABI, authorization defaults or public CLI behavior changes require an ADR + tests + spec updates. 11. RFC-LANG-0002 is implemented by the frontend, `marqdo-expression`, IR lowering, runtime and the bundled stdlib. Keep `spec/`, implementation, fixtures, stdlib digest and docs in lockstep; there is no legacy mapper or per-file syntax switch to fall back to. Do not make a release claim beyond the evidence recorded in `docs/STATUS.md`. +## Pre-stable protocol changes + +Read [ADR-0068](docs/adr/0068-single-current-public-contracts.md) before changing +a public boundary. Keep one current specification, producer and validator per +boundary. Replace retired paths in the same integration, reject unsupported +formats explicitly, and update independent consumers and release smoke tests. +Keep old formats in Git history. Preserve authority, attribution and resource +limits during refactors. Confirm cross-repository and release evidence before +closing a protocol replacement issue. + ## Development workflow 1. Identify the affected rule and cite RFC-LANG-0002 / `spec/mapping.md` (or, for architecture-only changes, the relevant `docs/DEVELOPMENT_BLUEPRINT.md` section). diff --git a/docs/adr/0068-single-current-public-contracts.md b/docs/adr/0068-single-current-public-contracts.md new file mode 100644 index 0000000..59ab16d --- /dev/null +++ b/docs/adr/0068-single-current-public-contracts.md @@ -0,0 +1,53 @@ +# ADR-0068 — One current contract per public boundary + +Status: Accepted for implementation on the pre-stable 3.0 line (2026-11-24). + +## Context + +Issue [#8](https://git.cflmy.cn/cflmy/marqdo-cli/issues/8) identified two +independent Analysis version selectors. A tool could install successfully +even when it could not read the output for a given project. The runtime +also projected the same execution into independently defined Trace and +Execution Events protocols. The compilation pipeline described in +DEVELOPMENT_BLUEPRINT §7 remains the source of language facts. + +## Decision + +Before the first stable release, replace a broken public contract in place. +For each boundary, keep one current format identifier, one producer and one +validation path. Reject mismatches explicitly. Update the CLI, schemas, +consumers, fixtures and CI in the same integration. Use Git history and +release tags to retrieve retired specifications. A future stable release +requires its own compatibility policy. + +- Analysis is always `marqdo.analysis` revision 3, including projects without + loop transfers. The Markdown AST and IR remain internal authorities. +- Runtime observations use `marqdo.observation` revision 1. One run emits + one sequence. JSONL stdout and JSON snapshots deliver those same events. + `run` and `call` use `--output text|json|jsonl` and + `--observation-file PATH`. Capture selections and budgets apply to all + observation destinations. +- Tool manifests use `marqdo.cli-tool` revision 2, with a required + `requires.api_revision: 1` and optional exact Analysis and Observation + requirements. Reinstall tools registered under earlier formats. The + existing Tool subcommands and external dispatch suffice for this workflow. +- Keep the three current extension descriptors. Callable exports, resource + rights and foreign interpreter selection have independent validation and + lifecycles. Share value encoding and equivalent process transport + primitives. Keep Lock v4 because its graph and artifact identities still + describe the selected extensions without a format change. + +## Security and verification + +Static analysis stays non-executing. Observation binds to the exact Analysis +artifact and defaults to structural capture. Selected values, Text consent, +handles, buffering, output bytes and failure/truncation must follow the +current observation contract. Preserve native trust, process timeouts, +worker quarantine, capability grants, artifact integrity and fail-closed +strict behavior. + +Exercise real CLI output with an independent consumer, including old-input +rejection, two simultaneous destinations from a single invocation, source +digest mismatches, allowlisted capture, and consumer installation. Validate +independent View and Lint against the final CLI, then validate the shipped +archive and its SHA-bound release evidence before tagging an RC. diff --git a/docs/architecture/CURRENT.md b/docs/architecture/CURRENT.md index d33bbd4..8796a3a 100644 --- a/docs/architecture/CURRENT.md +++ b/docs/architecture/CURRENT.md @@ -62,6 +62,10 @@ replace `spec/` or a recorded test log. > statements it emits. The interpreter owns the transfers and reports them > through the existing observation facade. +Protocol architecture and pre-stable replacement rules are recorded in +[ADR-0068](../adr/0068-single-current-public-contracts.md). Check the +[implementation status](../STATUS.md) for rollout and release evidence. + ## 1. Four state dimensions A claim is stated in exactly one of these dimensions. "Exists in the tree" is not