docs: fix relative links after status archival

This commit is contained in:
cflmy committed 2026-11-20 14:00:20 +08:00
1 parent e7168b5c26
commit 9b001a33a5
2 files changed
+4 -4

No files matched your search

+1 -1
View File
@@ -49,7 +49,7 @@ reproduce the Windows checkout byte behavior.
- `strict` additionally requires a kernel/environment that permits user, - `strict` additionally requires a kernel/environment that permits user,
mount, PID and network namespaces, plus delegated cgroups. The current mount, PID and network namespaces, plus delegated cgroups. The current
container does not, so strict is refused. See container does not, so strict is refused. See
[`docs/security-gate.md`](security-gate.md). [`docs/security-gate.md`](docs/security-gate.md).
## Explicitly unsupported in this candidate ## Explicitly unsupported in this candidate
+3 -3
View File
@@ -11,10 +11,10 @@ complete.
> **M0.6 planning cross-reference (2026-11-20)**: this file is the M0.5 evidence > **M0.6 planning cross-reference (2026-11-20)**: this file is the M0.5 evidence
> snapshot that the M0.6 audit was based on. Read > snapshot that the M0.6 audit was based on. Read
> [`docs/CORE_STABILIZATION_AND_ECOSYSTEM_GATE.md`](CORE_STABILIZATION_AND_ECOSYSTEM_GATE.md) > [`docs/CORE_STABILIZATION_AND_ECOSYSTEM_GATE.md`](../CORE_STABILIZATION_AND_ECOSYSTEM_GATE.md)
> (current-stage stabilization spec, baseline `0adebe4`), > (current-stage stabilization spec, baseline `0adebe4`),
> [`docs/EXTENSIBILITY_AUDIT.md`](EXTENSIBILITY_AUDIT.md) (issues E01–E16) and > [`docs/EXTENSIBILITY_AUDIT.md`](../EXTENSIBILITY_AUDIT.md) (issues E01–E16) and
> the proposed [`docs/NEXT_PHASE_IMPLEMENTATION.md`](NEXT_PHASE_IMPLEMENTATION.md) > the proposed [`docs/NEXT_PHASE_IMPLEMENTATION.md`](../NEXT_PHASE_IMPLEMENTATION.md)
> alongside it. The stabilization spec supersedes the earlier plans on the > alongside it. The stabilization spec supersedes the earlier plans on the
> current baseline, gap list and G-A/G-B/G-C release gates; none of these plans > current baseline, gap list and G-A/G-B/G-C release gates; none of these plans
> claims any gap below is fixed. Per audit item > claims any gap below is fixed. Per audit item