Bump the workspace product version, document the in-place Analysis contract
replacement, update the current-facing guides and architecture overview, and
record the local gate plus the 101-module/rc.3 performance comparison. The
candidate is not a release: same-SHA CI, archive cold install, frozen external
conformance and the strict VM gate are still required before tagging.
The first rc.3 perf comparison reused the old workload commands but switched
them to `run/call --output json`, so the candidate was timed while producing
thousands of structural events that the beta baseline never emitted. The result
was a reproducible +240..+375% p50 and +130% RSS delta caused by the
measurement, not by the program's execution cost.
- Give each run/call workload a correctness command (current Observation
snapshot, full contract digest) and a measurement command (plain execution
path, committed text digest).
- Verify the correctness digest once per workload and the measurement digest on
every timed sample; a wrong or changed output is never timed.
- Re-record the expected digests and extend the tooling tests.
- A protocol document that is produced only on request must not be billed as
an execution regression.
The nine G4 workloads still requested the retired `run/call --json` option,
so every non-check workload exited 2 and was recorded as CORRECTNESS_FAIL; the
RC performance gate could not run at all.
- Request `--output json` for run/call workloads and re-record the committed
expected digests.
- Pin correctness to the current snapshot: terminal status/result, committed
stdout/stderr byte digests, and ordered event-kind counts with a sequence
digest. Run ids, wall-clock stamps and host paths are excluded, so a correct
program keeps one stable digest.
- Add tooling tests for the workload catalogue and digest stability.