feat: dynamic extension market and capability control #12

Merged
cflmy merged 2 commits from feat/market-capability into main 2026-11-29 10:44:13 +08:00
2 Commits
Author SHA1 Message Date
cflmy b0f39dad94 docs: record final market CI evidence
ci/woodpecker/pr/ci Pipeline was successful
ci/woodpecker/push/ci Pipeline was successful
2026-11-29 10:32:51 +08:00
cflmy 629cff0301 feat: add the dynamic extension market and capability control
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/pr/ci Pipeline was successful
Replace the fixed component candidate enumeration with a user-configurable
market projection over Gitea topics and local directories. Install verified
payloads into a user-level capability store, require explicit activation and
scope enablement before a model can see them, and gate project import through
the published CLI add/lock commands. Update the ecosystem catalog, bootstrap
default tool installation, and status evidence.
2026-11-29 10:20:41 +08:00